1,044 kWh Peak Shaving BESS · Shenzhen

1,044 kWh Peak Shaving BESS · Shenzhen

Commercial & Industrial BESS Supply · Clou Energy 125 kW / 261 kWh All-in-One Storage Cabinets

Commercial & Industrial BESS Supply · 1,044 kWh Peak Shaving Grid-Tied System

Clou Energy 125 kW / 261 kWh All-in-One Storage Cabinets · Shenzhen, China
August 2025Shenzhen, Guangdong1,044 kWh / 500 kW · 50 Days PO-to-Deliverywww.sjsolarhub.com
SECTION I.

Project Overview

ParameterValue
Total System Capacity1,044 kWh (4 × 261 kWh)
Total System Power500 kW (4 × 125 kW)
Unit SpecificationClou Energy 125 kW / 261 kWh C&I All-in-One BESS
ApplicationPeak Shaving & Valley Filling
Grid Connection ModeGrid-Tied BESS
LocationShenzhen, Guangdong, China
Production Lead Time50 Days from PO to Delivery
Commissioning DateAugust 2025
Export CertificationsCE / IEC 62619 / UL 9540 / UN38.3
SECTION II.

Product Solution

This project deploys 4 units of Clou Energy commercial & industrial all-in-one energy storage cabinets, each with 261 kWh capacity and 125 kW power rating, paralleled to form a 1,044 kWh / 500 kW energy storage system. Clou Energy is a global leading ESS manufacturer ranked among the top 10 worldwide by shipment volume, with products deployed across Europe, North America, and Southeast Asia markets.

ParameterPer UnitSystem TotalNotes
Battery Capacity261 kWh1,044 kWhLFP (LiFePO₄)
Rated Power125 kW500 kWBidirectional Inverter
Cycle Life≥ 6,000 cycles@25℃ / 80% DOD
System Efficiency≥ 90%AC Round-trip Efficiency
IP RatingIP54Outdoor Rain & Dust Proof
CoolingSmart Air CoolingAdaptive Temperature Control
DimensionsStandard CabinetCompact Footprint
Weight~3.5 Tons~14 TonsIncluding Base
Clou 125 kW / 261 kWh C&I All-in-One BESS (Product Photo 1)
Clou 125 kW / 261 kWh C&I All-in-One BESS (Product Photo 1)
Clou 125 kW / 261 kWh C&I All-in-One BESS (Product Photo 2)
Clou 125 kW / 261 kWh C&I All-in-One BESS (Product Photo 2)
SECTION III.

Application: Peak Shaving & Valley Filling

In commercial and industrial electricity usage scenarios, significant peak-to-valley price spreads exist. The BESS charges during nighttime low-price periods and discharges during daytime peak-price periods. Through a “low-charge high-discharge” strategy, the system reduces enterprise electricity costs while alleviating peak-load pressure on the grid.

Time PeriodStrategyBenefit
Night Valley 23:00–08:00Charge at low grid price · Store energy in BESSEnergy stored for daytime use
Day Peak 09:00–12:00 / 14:00–17:00Discharge at peak price · Offset expensive grid powerReduce electricity bills by 30–50%
Critical Peak 19:00–22:00Emergency discharge support · Avoid demand charge penaltiesPrevent peak demand surcharges
ECONOMIC BENEFITS · ESTIMATED ROI

Based on this project's 1,044 kWh capacity, 2 daily cycles, 300 operating days per year, and a peak-to-valley price spread of ~0.12 USD/kWh, the system achieves estimated annual electricity savings of ~66,000 USD (accounting for 90% round-trip efficiency). Typical payback period is 3–4 years depending on local tariff policies.

SECTION IV.

Supply & Commissioning Workflow

SJ Solarhub provides one-stop BESS delivery services from site survey, product supply, foundation construction, equipment installation to grid commissioning. This project moved from purchase order to grid connection in just 50 days, validating our efficient supply chain management and engineering execution capability.

Site Survey

Survey BESS installation location, cable routing, and distribution room capacity; confirm interconnection points and installation conditions.

Site survey — installation location / cable routing / distribution-room status
Site survey — installation location / cable routing / distribution-room status

Foundation Work

Pour concrete foundation for storage cabinets, embed cable conduits, ensure load-bearing capacity and waterproofing.

Foundation work — concrete pouring + embedded cable conduits
Foundation work — concrete pouring + embedded cable conduits

Product Delivery

50-day production lead time; cabinets delivered from factory to site with factory inspection reports.

Product delivery — factory shipment, unloading and unpacking acceptance
Product delivery — factory shipment, unloading and unpacking acceptance

Installation

Cabinet positioning, DC/AC cable connection, communication system commissioning, fire protection configuration.

On-site installation — cabinet positioning + cable connection + fire protection
On-site installation — cabinet positioning + cable connection + fire protection

Grid Connection

Connect to on-site distribution system, EMS energy management system commissioning, utility acceptance and grid synchronization.

Grid commissioning — utility acceptance, EMS go-live, grid synchronization
Grid commissioning — utility acceptance, EMS go-live, grid synchronization
SECTION V.

Certifications & Standards

The Clou commercial energy storage cabinets supplied by SJ Solarhub have passed multiple international authoritative certifications, meeting market access requirements for Europe, North America, the Middle East, Japan, India, and other major markets—ensuring product safety, performance, and compliance.

CertificationMarketScope
CE MarkingEuropeLVD / EMC / RoHS Directive Compliance
IEC 62619GlobalSafety of Industrial Li-ion Cells & Systems
IEC 62933GlobalSafety Requirements for EESS
UL 9540North AmericaEnergy Storage System Safety Standard
UL 1973North AmericaSafety for Stationary Battery Systems
UN38.3GlobalLithium Battery Transport Safety
SECTION VI.

Key Advantages

01

Global Brand Partnership

Authorized distributor of Clou Energy C&I storage cabinets. Clou ranks among the top 10 global ESS manufacturers by shipment volume, with deployments across Europe, North America and Southeast Asia.

02

Rapid Delivery Capability

From PO to product delivery in just 50 days — agile supply-chain management built for urgent project timelines.

03

Peak Shaving Expertise

Built-in EMS executes charge/discharge strategies automatically — no manual intervention, with 30–50% annual electricity savings.

04

Strong Grid Compatibility

Grid-tied operation with adjustable power factor and full anti-islanding protection — compatible with grid interconnection standards across multiple countries.

05

Multi-Layer Safety Protection

LFP cells + three-level BMS + fire-suppression interlock + combustible-gas detection — system-level safety design.

06

Compact Outdoor Design

IP54 protection + smart air-cooling thermal management + standard cabinet dimensions + small footprint — ideal for space-constrained C&I sites.

07

One-Stop Delivery

SJ Solarhub manages the full lifecycle — survey, supply, construction, grid connection and O&M — through one accountable point of contact.

SECTION VII.

About SJ Solarhub

SJ Solarhub provides integrated EPC solutions covering PV, energy storage, and EV charging infrastructure for commercial, industrial, and residential clients. With 12 years of deep expertise in the new energy sector, our team holds national-grade new energy design qualifications and electrical engineering construction licenses, having cumulatively completed project designs exceeding 150 MW across China and international markets.

In the energy storage domain, we maintain authorized distribution partnerships with global leading ESS manufacturers such as Clou Energy, possessing full-chain delivery capability spanning product selection, supply chain procurement, export logistics, on-site installation, and grid commissioning. All supplied products carry CE, IEC, UL, and other international certifications, supporting compliant market access worldwide.

We provide one-stop energy storage solutions from needs analysis, system design, equipment supply, construction, to O&M hosting, supporting major global certification systems (IEC / TÜV / CE / SAA / ETL / UL).