
Case Studies
Real project deliveries — from PV design to PV+storage+charging integration and C&I BESS supply
Project Cases
Featured PV, storage and PV+storage+charging projects across the Greater Bay Area

Huizhou Boluo · PV-Storage-Charging Integrated Demonstration Station
600 kWp BIPV solar canopy + 125 kW / 261 kWh LFP storage + 3×60 kW DC fast chargers and 8×7 kW AC chargers. PV directly powers the chargers during the day, surplus is stored; storage discharges at night for green-energy self-sufficiency. From design to grid in 60 days.

Shenzhen Guangming · 600 kW C&I Rooftop PV Design + 3D Rendering
UAV aerial mapping → 3D rendering → precise drawings. We deliver true-to-site 3D effect previews, optimized shading and cable routing, and a full drawing package — survey to issued drawings in just 20 days.

Dongguan Qingxi · 1 MW / 2 MWh C&I BESS Equipment Supply
LFP 280 Ah cells · 125 kW PCS · 3-level BMS + local & cloud EMS · perfluoroketone fire suppression. Modular design supports parallel cabinet expansion; pre-set TOU arbitrage strategy — power on and run. 50 days from PO to factory delivery.
Got a similar project?
We deliver turnkey PV, storage and PV+storage+charging projects across residential, C&I and utility scales — from survey and design to equipment supply, EPC construction and grid connection.
Get a Quote →